Summary
Infrastructure accountability has shifted from watch signal to operating constraint across North Carolina. Cumberland County has adopted a data-center moratorium, Harnett County is using moratorium and PFAS capital-planning tools, SB 730 has moved through the House and back to Senate Rules, and utility, EV, and defense-corridor calendars now provide concrete dates for monitoring. Atlas Grid Systems is tracking these signals as directional evidence that responsible infrastructure strategy must answer utility cost, water resilience, local governance, and resilience questions before opportunity narratives move forward.
